Project Reports

No reports available for this project at this time.

2011 Construction

Clearing and site preparation for Freeport Platform.
Pile driving for raised center platform in Freeport.
Pan Am crew installs crossing signal at Upper Mast Landing Road in Freeport.
A crew from Pan Am Railways installs rail seal at Bow Street grade crossing in Freeport.
Construction continues on the elevated platform at Maine Street Station in Brunswick.
H. B. Fleming began the process of driving piles for the Brunswick Platform
D & C Construction and H. B. Fleming begin work on the Brunswick platform
Grade crossing reconstruction requires a minimum of two one-day road closures.
Crews remove pavement and track at Stanwood Street in Brunswick as part of the grade crossing reconstruction.
Pan Am crews in the process of removing pavement at Congress Street grade crossing.
Crews install a pre-built section of track.
Crews insert pre-built crossing panel at Ashmont Street in Portland.
Temporary wooden decks are placed on either side of the track to facilitate the passage of traffic.
A crew from Pan Am Railways installs a temporary wooden deck.
The track crew removes the temporary crossing deck in preparation of paving.
Crews tamp and align the track prior to paving.
Paving of Lincoln Street in Portland will provide a smoother ride for motor vehicles.
The upgraded Stanwood street crossing provides a smoother transition across the tracks for motorists.
Upgraded Union Street Grade Crossing
A new fence in Brunswick is one of various area improvements along the rail line right of way.
Brunswick Track Improvement Project
Prep Work, Brunswick Track Improvement Project
Drainage installation, Brunswick Track Improvement Project
Crews work on the installation of drainage pipes and catch basins in Brunswick.
Pan Am crew assembling crossing panels at Sligo Road in Yarmouth.
Pan Am crew assembling crossing panels at Sligo Road in Yarmouth.

View NNEPRA Project Photo Galleries >>